Issue Nº 001 · London EC2 · Est. 2026
Win more London
tenders, faster.
Bidsmith is the AI bid writer built for UK construction. Upload an ITT, and within minutes get a first draft grounded in NRM2, JCT, CDM 2015, Building Regs and the GLA Social Value Charter — fully cited, ready for your bid manager to refine.
Method Statement · Draft 1
3.2 Temporary Works
All temporary works will be designed and checked in accordance with BS 5975:2019 and reviewed by an independent Temporary Works Coordinator under the scope of CDM 2015 Reg. 13. Designs will be submitted to the Principal Designer no later than 4 weeks prior to commencement.
Sequencing will follow the LLDC's permitted hours for the Stratford Waterfront zone (07:30–18:00 Mon–Fri)…
Grounded in the standards that matter
How it works
From ITT to submission-ready in a single afternoon.
01
Upload the ITT pack
Drop in the tender documents — PDF, DOCX, drawings. Bidsmith reads pricing schedules, evaluation criteria and submission requirements.
02
AI builds the brief
Within minutes you get a structured response plan: section-by-section evaluation weighting, mandatory compliance, deadlines, and risks flagged.
03
Draft & refine
Generate Method Statement, Programme, Social Value, H&S and Pricing Narrative — each citation traces back to NRM2, JCT clauses or your past wins.
04
Export & submit
One-click DOCX or PDF, branded to your house style, version-controlled, ready for your bid manager's sign-off.
Knowledge base
Trained on the codes London evaluators actually score against.
Every paragraph Bidsmith writes is anchored to a citation. No hallucinated clauses. No "as per industry best practice" filler.
London KB
- ·NRM 1 & 2
- ·JCT 2024 suite
- ·LLDC planning guidance
- ·TfL standards
- ·GLA Social Value Charter
Compliance
- ·CDM 2015
- ·Building Regs Part A–R
- ·BS 5975 temporary works
- ·HSE construction guidance
- ·Modern Slavery Act
Your private KB
- ·Past winning bids
- ·CVs & case studies
- ·Programme templates
- ·Pricing schedules
- ·Brand style guide
Built for procurement reality
Pass the compliance checklist before you press submit.
Bidsmith reads the evaluation matrix and tells you exactly which mandatory clauses are missing, which word counts are over, and which Social Value commitments you have not yet quantified.
Compliance checklist · Riverside School Phase 2
- ✓CDM 2015 Principal Contractor declarationPass
- ✓Modern Slavery Act statement attachedPass
- ✓ISO 9001 + 14001 + 45001 certificatesPass
- !Social Value: 2 of 4 GLA priorities addressedAdd 2 commitments
- ✓Method Statement under 12 page limit11 pages
- !Pricing schedule rates · 3 items missingAwaiting QS
Free 7-day trial
Your next London tender deserves better than a blank page.
Set up your team in under 5 minutes. No credit card. Cancel any time.